Santa Clara store no longer opening early 2025?
Hey, I know the new Santa Clara store was originally announced to open in late 2024, then pushed to early 2025, now the wording on the website is just an obscure date of 2025, so I was just wondering if the store opening is now being pushed back further, to say mid, or even late 2025 now. I would love any updates if possible on the new store.
Answers
-
An update would be great. Micro Center will be my 2025 vacation, need to plan ahead
-
Drove past this morning. Still lots of construction guys outside doing stuff. My guess is we've still got a minimum of 2 months.
-
How about a ball park opening date for Santa Clara. Was "opening soon", "fall 2024", back to soon. Getting emails every day and 95% of what I need is "in store only" and am 400 miles north or ~$400 round trip flight to Orange County. Did shop in the Santa Clara store by Mission College years ago.
-
Peaked my head inside today. I'm revising to 3 months minimum.
-
Has anybody peaked in lately?
-
I went to the site today. Most of the Micro Center signs and banners have been removed from the building. Just a month ago, there were “Coming Soon” and “Apply for Jobs” banners, but those are now gone. However, the street sign is still up.
There haven’t been any signs of construction for about a month—no materials or workers coming in or out. The front windows are blacked out, with a top section showing pink insulation. The front doors are blocked with metal panels, which seem more reinforced than the ones that were previously at the former Bed Bath & Beyond (now the Micro Center location).
I wish I had checked the back or garage for signs of garbage or activity, but I didn’t. I doubt it’ll open anytime soon. Most job listings for the store have been filled, so I have no idea what’s going on. It’s frustrating that Micro Center is staying silent, unlike with past store openings.
-
Went by today and they were doing some work on the front fascia, presumably getting the electrical ready for the Microcenter front sign. Doors were open and shelves are up, but definitely still a bit more work. Late May perhaps?
-
Thank you, i also noticed work being done this easter, didn’t say i could see inside though, progress is slow, but i hope may too
Categories
- All Categories
- 1 The Blog
- 1 What's Trending
- 7.6K The Community
- 3.1K General Discussion
- 120 New Members
- 815 Consumer Tech
- 206 Prebuilt PCs and Laptops
- 159 Software
- 31 Audio/Visual
- 50 Networking & Security
- 4 Home Automation
- 5 Digital Photography
- 13 Content Creators
- 28 Hobby Boards & Projects
- 80 3D Printing
- 83 Retro Arcade/Gaming
- 60 All Other Tech
- 326 PowerSpec
- 2.6K Store Information and Policy
- 145 Off Topic
- 48 Community Ideas & Feedback
- 601 Your Completed Builds
- 3.8K Build-Your-Own PC
- 2.7K Help Choosing Parts
- 321 Graphics Cards
- 333 CPUs, Memory, and Motherboards
- 140 Cases and Power Supplies
- 53 Air and Liquid Cooling
- 46 Monitors and Displays
- 89 Peripherals
- 60 All Other Parts
- 62 Featured Categories
We love seeing what our customers build
Submit photos and a description of your PC to our build showcase
Submit NowLooking for a little inspiration?
See other custom PC builds and get some ideas for what can be done
View Build ShowcaseSAME DAY CUSTOM BUILD SERVICE
If You Can Dream it, We Can Build it.

Services starting at $149.99