AMD Zen 3/Ryzen 5000 Series Launch Discussion
Comments
-
Anyone at Chicago or Westmont location?
-
What's the deal with the timestamps saying 3:00am...i don't get it.
-
Line is wrapped around the building now in Houston.
-
KrimsonRelik said:Line is wrapped around the building now in Houston.
-
alex_sowep said:Anyone at Chicago or Westmont location?
-
qwertytheasdf said:KrimsonRelik said:Line is wrapped around the building now in Houston.
-
5 people in line at the Rockville location with everyone on a list and want 5900x. Probably no need to rush out for others interested, probably show up closer to 4 or 5am. I was informed that the store staff won't even start handing out vouchers until 6-7am depending on when they arrive.
I will only post updates every 5 people who show up until closer to 5am. So if you don't see my post any updates then expect around the number I last posted. So it could be 5-9 people for a while.
-
Anyone at St David's in PA?
-
Anyone in line at Tustin if so how many?
-
Anyone waiting in cambridge mass? Getting nervous watching all the online activity and might drive out from connecticut early to wait in line.
-
Confirmed no 5950x at Yonkers MC. NE stating 5950x and 5900x stock is not great. 5600x and 5800x is better.
-
Cellie said:Confirmed no 5950x at Yonkers MC. NE stating 5950x and 5900x stock is not great. 5600x and 5800x is better.
I have also been told that there will be no 5950x at Rockville. So unless a miracle happens and unplanned stock suddenly comes in then none here.
-
One of the Ryzen marketing managers took note of one of my tweets about camping out and delivered free Domino's to us in Fairfax LOL
-
Hyperflame said:One of the Ryzen marketing managers took note of one of my tweets about camping out and delivered free Domino's to us in Fairfax LOL
One of the AMD guys is here at the Rockville store now. He took a picture to document it.
-
Sheepykin said:5 people in line at the Rockville location with everyone on a list and want 5900x. Probably no need to rush out for others interested, probably show up closer to 4 or 5am. I was informed that the store staff won't even start handing out vouchers until 6-7am depending on when they arrive.
I will only post updates every 5 people who show up until closer to 5am. So if you don't see my post any updates then expect around the number I last posted. So it could be 5-9 people for a while. -
PrivateRyanINDE said:Anyone waiting in cambridge mass? Getting nervous watching all the online activity and might drive out from connecticut early to wait in line.
-
@bbnn doesn’t look like it but everyone is really chill and friendly here we know the order
-
CrashAegis said:AARGH said:PrestonYoungsley said:Whats breakdown of chips wanted out of the 22 @ fairfax,
I'll probably just roll up in the AM, all i want is a measly 5600x
08 5950
13 5900
01 5800
01 5600
and 3 for 3080 cards just in case
11 - 5950
16 - 5900
02 - 5800
01 - 5600
04 - Also interested in 3080's -
radioToys said:Sheepykin said:5 people in line at the Rockville location with everyone on a list and want 5900x. Probably no need to rush out for others interested, probably show up closer to 4 or 5am. I was informed that the store staff won't even start handing out vouchers until 6-7am depending on when they arrive.
I will only post updates every 5 people who show up until closer to 5am. So if you don't see my post any updates then expect around the number I last posted. So it could be 5-9 people for a while.
As far as we are aware the manager will arrive sometime between 6 and 7am. They will hand out vouchers to the line so that you don't have to stay until they open like the other releases. I believe most stores have it be until 3pm when you can redeem but I haven't been here for a release before and I don't know more than the fact that they will most likely hand out vouchers. This store did change their hours starting last Sunday, so they are open from 9am instead of the 10am that they used to open.
From what I am aware of the 5600x and 5800x there is no rush. The only CPU that will be very limited will be the 5900x, which is to be expected.
So I would say see if you can swing by around 6:30am to get a spot for the voucher. Sadly I don't know more or I would tell you.
-
@Cellie how’s the line at Yonkers? Can’t get there until about 8. Just wondering if it’s worth the trip
-
Sheepykin said:radioToys said:Sheepykin said:5 people in line at the Rockville location with everyone on a list and want 5900x. Probably no need to rush out for others interested, probably show up closer to 4 or 5am. I was informed that the store staff won't even start handing out vouchers until 6-7am depending on when they arrive.
I will only post updates every 5 people who show up until closer to 5am. So if you don't see my post any updates then expect around the number I last posted. So it could be 5-9 people for a while.
As far as we are aware the manager will arrive sometime between 6 and 7am. They will hand out vouchers to the line so that you don't have to stay until they open like the other releases. I believe most stores have it be until 3pm when you can redeem but I haven't been here for a release before and I don't know more than the fact that they will most likely hand out vouchers. This store did change their hours starting last Sunday, so they are open from 9am instead of the 10am that they used to open.
From what I am aware of the 5600x and 5800x there is no rush. The only CPU that will be very limited will be the 5900x, which is to be expected.
So I would say see if you can swing by around 6:30am to get a spot for the voucher. Sadly I don't know more or I would tell you. -
The situation at Tustin MC as of 8:30PM 11/4: ~20 people are lined up outside the store in queue for the 5000 series launch however a list has already been established with well over 100 people who have already "secured there position in line" for whatever processor they want. They are no longer needed to be present until check-in times at 4am and 7am on launch day. The problem with this is MC sale of the CPUs are based off of a first come first serve basis. Despite that people were able to come and go as the please without having to physically wait in line, which is typically part of the FCFS process for items with limited availability. This is pretty unfair to the people who are willing to wait in line for however long in order to purchase the product. This system would have been better suited for a raffle giving people the equal opportunity of securing a CPU while saving many time and effort. I understand that this maybe a smarter move in light of COVID-19 however, I feel that MC should be doing more to organize these actual releases rather than leaving it up to the consumers waiting outside. I believe the system was inspired by the one started during the 30 series GPU releases as shown in BitWit's video on youtube, however that system was much more rigid with 30 minute check-in times and required potential buyers to be in queue for much longer times than not as FCFS queues should be. Whether or not the 100 or so people who've already signed up would've been willing to wait when they arrived until doors open, doesn't change the fact that the situation is what it is right now, that there is no real queue and that the list could have easily been manipulated preventing people who were more willing to wait to purchase their item from doing so.
TLDR: MC Tustin is getting run by a bunch of people who don't know how a first come first serve queue works. As someone whos camped out over the years for items with limited availability such as shoes, clothing, collectables, etc. This is pretty bullshit. -
Xkix said:@bbnn doesn’t look like it but everyone is really chill and friendly here we know the ordernice you guys stay safeAARGH said:CrashAegis said:AARGH said:PrestonYoungsley said:Whats breakdown of chips wanted out of the 22 @ fairfax,
I'll probably just roll up in the AM, all i want is a measly 5600x
08 5950
13 5900
01 5800
01 5600
and 3 for 3080 cards just in case
11 - 5950
16 - 5900
02 - 5800
01 - 5600
04 - Also interested in 3080's
-
Sheepykin said:radioToys said:Sheepykin said:5 people in line at the Rockville location with everyone on a list and want 5900x. Probably no need to rush out for others interested, probably show up closer to 4 or 5am. I was informed that the store staff won't even start handing out vouchers until 6-7am depending on when they arrive.
I will only post updates every 5 people who show up until closer to 5am. So if you don't see my post any updates then expect around the number I last posted. So it could be 5-9 people for a while.
As far as we are aware the manager will arrive sometime between 6 and 7am. They will hand out vouchers to the line so that you don't have to stay until they open like the other releases. I believe most stores have it be until 3pm when you can redeem but I haven't been here for a release before and I don't know more than the fact that they will most likely hand out vouchers. This store did change their hours starting last Sunday, so they are open from 9am instead of the 10am that they used to open.
From what I am aware of the 5600x and 5800x there is no rush. The only CPU that will be very limited will be the 5900x, which is to be expected.
So I would say see if you can swing by around 6:30am to get a spot for the voucher. Sadly I don't know more or I would tell you. -
@Cellie how’s the line at Yonkers? Can’t get there until about 8Am. Just wondering if it’s worth the trip
-
3080nao said:PrivateRyanINDE said:Anyone waiting in cambridge mass? Getting nervous watching all the online activity and might drive out from connecticut early to wait in line.
-
Who's at Paterson Microcenter? How many people are there?
-
CrashAegis said:Looks like Fairfax is tapped out just about but Rockville isn't awful yet, mind dropping a head count around 3 Am to see if it's worthwhile trying to snow up? I need a tiny bit of sleep after election watching, thanks!
-
How many people are lined at dallas right now? I was planning on going early in the morning but if I have to go even sooner I will.
-
@Sheepykin do you know how many 5900x they have in inventory
Leave a Comment
Categories
- All Categories
- 1 The Blog
- 1 What's Trending
- 7.3K The Community
- 3K General Discussion
- 98 New Members
- 775 Consumer Tech
- 190 Prebuilt PCs and Laptops
- 151 Software
- 30 Audio/Visual
- 50 Networking & Security
- 4 Home Automation
- 5 Digital Photography
- 12 Content Creators
- 27 Hobby Boards & Projects
- 75 3D Printing
- 83 Retro Arcade/Gaming
- 58 All Other Tech
- 274 PowerSpec
- 2.5K Store Information and Policy
- 139 Off Topic
- 37 Community Ideas & Feedback
- 595 Your Completed Builds
- 3.6K Build-Your-Own PC
- 2.6K Help Choosing Parts
- 302 Graphics Cards
- 313 CPUs, Memory, and Motherboards
- 134 Cases and Power Supplies
- 50 Air and Liquid Cooling
- 46 Monitors and Displays
- 88 Peripherals
- 56 All Other Parts
- 60 Featured Categories
We love seeing what our customers build
Submit photos and a description of your PC to our build showcase
Submit NowLooking for a little inspiration?
See other custom PC builds and get some ideas for what can be done
View Build ShowcaseSAME DAY CUSTOM BUILD SERVICE
If You Can Dream it, We Can Build it.
Services starting at $149.99